Industry
Doors & windows
DFV installed 2 SILO² multi-column Vertical Lift Modules with Smart Vision at its Surano facility, near Lecce, to automate just-in-time supply to the painting booths.
Smart Vision solves the issue of picking errors on visually identical packages at the source. The 340 m² of floor space recovered were converted into offices to support the company’s future development.
Doors & windows
SILO²
· +10% productivity
· picking errors eliminated
· 340 m² recovered
· Smart Vision with HD camera and QR code reading
· MES + ICON integration
With around 300 production orders per day at each plant and a color change every 30 minutes, having the powder coatings available exactly when and where they are needed is critical to production continuity.
In a production process scheduled entirely in real time, any error or delay in coating supply affects the entire production plan.
The critical issues of the previous system were clear:

More speed, zero errors, more space and a coating process that self-corrects
A direct result of the digital transformation of the entire facility
Smart Vision verifies every operation through QR code reading: no wrong paint package enters or leaves the storage system
Pallet racking removed and floor space converted into offices to support the company’s future development
Line-side storage in less than one seventh of the previous space, directly next to the painting line
Paint packages arrive at the picking and refilling station just a few minutes before use: no advance manual planning required.
The electronic scale weighs partially used paint packages when they return to storage and updates stock with the actual weight, eliminating stockouts
The pneumatic vacuum manipulator handles 20 to 25 kg paint packages with no physical effort, eliminating manual handling risks
The production plan generates picking missions directly in ICON: painters pick paint packages independently, without relying on warehouse personnel
Fast delivery is one of our strengths: we deliver around 80% of our production within 5 working days. This requires an organization built entirely around speed and efficiency
With 2 to 7 storage columns, over 120 tray size configurations and specific tray load bearing capacity up to 1,000 kg/m², SILO² is ICAM’s answer for companies managing small and medium-sized items, even those with a very high specific weight.
Explore SILO²Every distribution hub has its own SKU mix, volumes and seasonal peaks.
Tell us about your setup and we will design the right solution for you.